Schedule controls here are separate from the Windows Task Scheduler
(which runs 4× daily regardless of the API state).
Site Map & Flow Vector
--
-- m/s
--
Installation
External Hydrology Context
Sources: USGS NWIS (McDonald Ferry, hourly), USACE CWMS-Data API
(John Day Dam hourly outflow / forebay / tailwater),
DART daily project totals (spill flow, spill %, gas).
Per-unit / per-spill-bay / TSW data are not in the public APIs --
add CROHMS DQ2 series to [ExternalData] cwms_timeseries once
access is configured.
Flow Vector Timeline (last 7 days)
Flow Velocity
Tilt Angle
Signal Quality & SNR
Vibration
System (Battery / Internal Temp)
Power Dashboard
Checking API availability...
Sends STATUS / BATTERY / TIME / MEAS to the XLink and returns the
raw response. Note: load is fed through your Victron charge
controller, so the "Battery" voltage shown is the load-output
voltage (typically ≈ battery voltage at rest, ~0.1-0.3V drop
via the load FETs).
Summary Statistics
Configure Radar Settings
Checking API availability...
Sampling schedule
Measurements (M1 - M6)
#
Enabled
Label
SDI param
Units
Slope
Offset
Edit settings above, then click Save.
Warning: these settings are pushed live to the XLink over the
cellular link. Wrong values can stop data collection. Defaults are
based on OTT's manual recommendations for a bridge-piling SVR 100
deployment with 1-min samples averaged into 15-min logged values.